Skip to main content

Public contracts of Koungou · 2023 · Professional services

2023Ck/51-construction du réfectoire des écoles Koungou plateau maternelle et élémentaire

€49k
framework agreement: a maximum envelope for orders over 2 years, not spending — what was paid on it is not published
Signed on 8 June 2023 · ended around June 2025 · 2 yrs

That is at most ~€24k a year on average: a maximum too.

Company selected

GB2A IngenierieIngénierie, études techniques · registered office Caen (14000) · headcount 3 to 5 employees · SIREN 519653638

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Amceo. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 127 by amount of the 139 contracts Koungou published for 2023.

Other contracts of GB2A Ingenierie in Koungou

2023Ck/52-construction du réfectoire des écoles de majicavo Lamir2023 · maximum over 2 years49€k2023Ck/49-construction du réfectoire de l’école grand bassin a longoni2023 · maximum over 2 years49€k2023Ck/53-construction du réfectoire des écoles koropa 3 maternelle…2023 · maximum over 2 years45€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Framework agreement : yes: orders follow, the amount is a ceiling

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.