Skip to main content

Public contracts of Koungou · 2022 · Construction and buildings

Terrassement, maçonnerie, réfection de voirie et réseaux divers (gros travaux)

€8.3M
maximum contract amount over 4 years — what was paid on it is not published
Signed on 7 March 2022 · ended around March 2026 · 4 yrs

That is at most ~€2.1M a year on average: a maximum too.

Company selected

Mayotte Route EnvironnementFabrication d'autres produits minéraux non métalliques n.c.a. · registered office Koungou (97600) · SIREN 519458467

Number 4 by amount of the 95 contracts Koungou published for 2022.

Other contracts of Mayotte Route Environnement in Koungou

2025/DGAPO/CK/70-Travaux préparatoires, terrassements généraux…2025 · maximum over 2.5 years710€k2024/Ck/42-terrasement-voirie-mobilier urbain espace verts2024 · maximum over 12 months161€k2023/Ck/93-structure, revêtement, bordure, signalisation…2023 · maximum over 15 months721€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Mixte

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.