La Clusaz: where the money goes
The public contracts of La Clusaz
Up to €21.7M: the maximum amount of the public contracts signed in 2025, over their whole term.
54 contracts in 2025 · €74.7M published from 2018 to 2026. Maximum amounts planned.
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid.
1 contract of 2025 (€45k published) is left out of the total and the lists: a ceiling copied onto the lots of one framework agreement, a duplicate publication, a framework ceiling above a quarter of the town’s yearly spending, or an out-of-scale amount.
Contracts signed by year
Click a year to see its contracts
Purchases by category, 2018–2026
Click a category to see its contracts
The 6 other categories
Main contracts of 2025
Click a contract to see its fiche
- Élargissement du pont de l’ARS et requalification du giratoireRazel-Bec (Bianco)up to €3.3M
- Élargissement du pont de l’ARS et giratoireBarrachin B.T.P. · consortium of 4 holders, whole-contract amountup to €3.1M
- Construction pôle sportif indoor et outdoorNégociation · Terre Eco · consortium of 10 holders, whole-contract amountup to €1.9M
- Maîtrise d’œuvre pour la construction d’un pôle sportifTerre Eco · consortium of 13 holders, whole-contract amountup to €1.9M
- Aménagement de pistes et extension du réseau neige, secteur de Balme : pistes Bergerie…Entreprise Boch et Freres · 2 lotsup to €1.5M
- Réseaux neigeEntreprise Boch et Freres · 2 holders, whole-contract amountup to €1.3M
- TerrassementEntreprise Boch et Freresup to €820k
- Route du Crêt du MerleRestructuration de voirie et renouvellement des réseaux d’eaux usées pluviales… · SARL Lathuille Freres Maconnup to €814k
- Travaux route MerleSARL Lathuille Freres Maconn · consortium of 2 holders, whole-contract amountup to €537k
- Reprise de l’étanchéité de la retenue FerriazFamy TPup to €521k
The 43 other contracts of 2025
- Reprise de l’étanchéité et du confinement de la retenue de la ferriazFamy TPup to €521k
- Concession d’aménagement : secteur AOP1SARL PVGup to €515k
- Remise en état de 100 m de la piste FeriazAll Tracks Conceptup to €490k
- Extension réseau neigePiste blanchot · Process · Technoalpin Franceup to €369k
- Remplacement groupe froid patinoireDalkia Froid Solutionsup to €335k
- Remplacement du groupe froid de la patinoireDalkia Froid Solutionsup to €335k
- Extension réseau neige process piste bergerieTechnoalpin Franceup to €280k
- Réseau process neigePiste bergerie · Technoalpin Franceup to €280k
- Process neigeSMD 400-Secteur balme · Technoalpin Franceup to €215k
- Réfection couverture toiture école de musiqueLP Charpenteup to €209k
- Couverture et zinguerieLP Charpente · consortium of 2 holders, whole-contract amountup to €208k
- Réaménagement vestiaires piscineNavicup to €162k
- Réaménagement des vestiaires de la piscineNavicup to €162k
- Fourniture exploseur autonome a gazMND Franceup to €151k
- Installation d’un exploseur autonome à gazMND Franceup to €151k
- Fourniture d’un télescopique sur pneus et ses équipementsVaudaux Jeanup to €112k
- Fourniture d’un engin télescopiqueVaudaux Jeanup to €112k
- Maîtrise d’œuvre aménagement pistes et réseau BalmeAbest Ingenierieup to €87k
- Maîtrise d’oeuvre pour les travaux d’aménagement de pistes et d’extension du réseau neigeSecteur de Balme · Abest Ingenierieup to €87k
- Sel de déneigementOgamalpup to €80k
- Étude pré opérationnelle pour l’extension du parking du salon des damesLaba Sud Estup to €70k
- Étude pré opérationnelle extension pk damesSerue Ingenierie · consortium of 2 holders, whole-contract amountup to €70k
- Cloisons faux plafondE.M.P.up to €68k
- Reprise avant toit en tavaillon EAADursun Charpenteup to €60k
- Maîtrise d’oeuvre pour les travaux d’aménagement de pistes et d’extension du réseau neigeSecteur du Merle, Mélèzes et de la combe des juments · Abest Ingenierieup to €59k
- Maîtrise d’œuvre aménagement Merle meleze combe jumentAbest Ingenierieup to €59k
- AgencementDarveyup to €52k
- Travaux d’aménagement de la Maison des habitantsEntreprise Benoit Guyot · 3 holders, whole-contract amountup to €52k
- ÉlectricitéÉlectricité Roger Mermillodup to €51k
- Carrelage et faïenceConception Realisation Carrelages - C.R.C. (C.R.C.)up to €51k
- Balayage chausséePLB GTX · framework agreement: a maximum envelope, not spendingup to €50k
- Balayage de chausséePLB GTX · framework agreement: a maximum envelope, not spendingup to €50k
- Plomberie traitement airEntreprise Benoit Guyotup to €50k
- 1000M remise état piste feriazAll Tracks Conceptup to €49k
- Remplacement exploseur BalmeMND Franceup to €45k
- Réfection carrelages pataugeoire + vestiaireBornier SARLup to €45k
- Sel de déneigementOgamalp · framework agreement: a maximum envelope, not spendingup to €40k
- Assistance à maîtrise d’ouvrage choix acquereurTeractemup to €40k
- Contrôle technique pour la construction d’un complexe sports et loisirs de montagneSocotec Constructionup to €35k
- Bassin nordique agencements boisDursun Charpenteup to €34k
Main suppliers, 2018–2026
Click a company to see its contracts
- Société de Gestion des Activités Touristiques de la Clusaz6 contractsup to €23.1M
- Perillat Travaux Publics9 contractsup to €5.7M
- Razel-Bec (Bianco)2 contractsup to €4.4M
- Terre Eco2 contractsup to €3.8M
- Entreprise Boch et Freres4 contractsup to €3.6M
- Technoalpin France14 contractsup to €3.6M
- T.P. Geo2 contractsup to €3.2M
- Barrachin B.T.P.1 contractup to €3.1M
The 87 other suppliers
- SARL Lathuille Freres Maconn12 contractsup to €2.4M
- Euro-Technologie1 contractup to €1.9M
- Zeller France1 contractup to €1.9M
- Etandex3 contractsup to €1.4M
- Artifex Climatis1 contractup to €1.2M
- Famy TP2 contractsup to €1M
- MND France8 contractsup to €893k
- All Tracks Concept5 contractsup to €840k
- Dalkia Froid Solutions2 contractsup to €670k
- Came France2 contractsup to €600k
- PPLR (Phenix Thermi Fluides)4 contractsup to €541k
- SARL PVG1 contractup to €515k
- LP Charpente2 contractsup to €417k
- Socco Entreprise2 contractsup to €408k
- Cet Bâtiment et Énergie1 contractup to €326k
- Navic2 contractsup to €325k
- Montreal Maconnerie Beton Arme1 contractup to €322k
- Vaudaux Jean4 contractsup to €304k
- Colas France1 contractup to €300k
- Bornier SARL3 contractsup to €293k
- Abest Ingenierie4 contractsup to €291k
- Transports Ludovic Perillat-Merceroz3 contractsup to €285k
- Devaux Fillard Habitat2 contractsup to €281k
- Profils Études2 contractsup to €240k
- Rock3 contractsup to €230k
- Gallay - Pollet Villard TP3 contractsup to €221k
- Denis Chappellaz Conseils1 contractup to €216k
- Ioa-Oteis1 contractup to €189k
- I.O.A.1 contractup to €189k
- Dahuts5 contractsup to €188k
- Cantines Scolaires la Clusaz1 contractup to €180k
- Avenir Protections3 contractsup to €175k
- Guidon SARL2 contractsup to €147k
- Cimes Énergies2 contractsup to €141k
- Edsun Loisirs1 contractup to €136k
- Ambulanceroth (Harmonie Ambulance)2 contractsup to €130k
- Hilltechnics1 contractup to €130k
- Dursun Charpente3 contractsup to €129k
- Forez Decors2 contractsup to €126k
- Ogamalp2 contractsup to €120k
- Montagne TV1 contractup to €120k
- Resiliences2 contractsup to €119k
Understanding these figures
What does a contract’s amount measure?
A contract’s amount is the maximum allowed over its whole term, often several years: it is not what the town spends in the year. The lots of one contract are grouped.
Where do these figures come from?
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.
Source: Public procurement — DECP (data.gouv.fr) ↗, consolidated and checked by Colin Maudry (colibre.fr ↗)