Public contracts of La Flèche · 2023 · Construction and buildings

Travaux giratoire RD323 RD306

€179k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 9 February 2023 · ended around June 2024 · 16 months

That is at most ~€135k a year on average: a maximum too.

Company selected

Luc DurandConstruction de réseaux pour fluides · registered office Longuenee-En-Anjou (49220) · headcount 250 to 499 employees · SIREN 318845229

Number 6 by amount of the 17 contracts La Flèche published for 2023. It belongs to the policy Streets and transport.

Other contracts of Luc Durand in La Flèche

Terrasst remblaiet surface roulement skatepark basket2023 · maximum over 10 months163€kTravaux préalables construction logements bd latouche2022 · maximum over 12 months61€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 8

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.