Skip to main content

Public contracts of La Grand-Croix · 2022 · Construction and buildings

Rénovation de la mairie et de l’annexe

€185k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 16 December 2022 · ended around February 2024 · 14 months

That is at most ~€158k a year on average: a maximum too.

Company selected

Maconnerie Di SottoTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Rive-De-Gier (42800) · headcount 10 to 19 employees · SIREN 510969082

Number 5 by amount of the 23 contracts La Grand-Croix published for 2022. It belongs to the policy Administration and shared services.

Other contracts of Maconnerie Di Sotto in La Grand-Croix

Démolition et maçonnerie2022 · maximum over 14 months199€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.