Supplier of La Haye · Construction and buildings
Avril
Avril holds 4 public contracts awarded by La Haye between 2022 and 2023. That is 7% of the value of the contracts the town awarded over the period.
head office in Vemars (95) · 20 to 49 employees · Travaux de menuiserie métallique et serrurerie · SIREN 443008586
Its contracts in La Haye
Maximum amount of each contract, over its whole term: not what was paid.
Réhabilitation et extension de la salle communale de BaudrevilleMenuiseries intérieures · Platrerie sèche · Plafonds suspendus · 2023 · maximum over 18 months · at most ~€118k a year on average · 2 lots · Simplified procedure€177kConstruction d’une salle pluriculturelle à La HayePlâtrerie sèche · Isolation · 2022 · maximum over 20 months · at most ~€54k a year on average · Simplified procedure€89kConstruction d’une salle pluricuturelle à La HayePlafonds suspendus · 2022 · maximum over 20 months · at most ~€53k a year on average · Simplified procedure€88kYear by year
Regions, départements, intercommunalities
Avril holds contracts awarded by 4 of these bodies, worth €3.3M.
Elsewhere in France
Avril holds contracts in 5 towns, worth €2.5M at award.