Supplier of La Plagne Tarentaise · Construction and buildings · Other
Société Nouvelle Eric Perriere
Société Nouvelle Eric Perriere holds 2 public contracts awarded by La Plagne Tarentaise between 2019 and 2022. That is 9% of the value of the contracts the town awarded over the period.
head office in La Plagne Tarentaise (73) · 3 to 5 employees · Travaux de terrassement courants et travaux préparatoires · SIREN 423449461
Its contracts in La Plagne Tarentaise
Maximum amount of each contract, over its whole term: not what was paid.
Terrassement, réfection de réseaux secs et humides et maçonnerie2022 · maximum over 4 years · at most ~€350k a year on average · framework agreement: a maximum envelope, not spending · Simplified procedure€1.4MCréation d’un espace de loisir avec un skatepark à Macot la Plagne2019 · maximum over 2 months · Simplified procedure€88k