Skip to main content

Public contracts of La Plaine-des-Palmistes · 2023 · Construction and buildings

Construction du centre technique

€197k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 31 August 2023 · ended around October 2023 · 2 months

Who won it

Travaux Bâtiment RenovationTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Andre (97440) · headcount 1 or 2 employees · SIREN 889459970

Number 8 by amount of the 29 contracts La Plaine-des-Palmistes published for 2023. It belongs to the policy Administration and shared services.

Other contracts of Travaux Bâtiment Renovation in La Plaine-des-Palmistes

2-locaux techniques2026 · maximum over 12 months404€kRéhabilitation plancher scène espace culturel guy agenor relance2026 · maximum over 12 months111€kRéhabilitation du local merveilles des plaines2025 · maximum over 2 months44€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 5

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.

Construction du centre technique: up to €197k over 2 months, La Plaine-des-Palmistes 2023 · Qipu