Skip to main content

Public contracts of La Riche · 2025 · Professional services

Maîtrise d’oeuvre pour la construction de 3 terrains de tennis couverts

€123k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 13 January 2025 · ended around September 2026 · 20 months

That is at most ~€74k a year on average: a maximum too.

Company selected

Cabin Études Structure Metalli AquitaineIngénierie, études techniques · registered office Merignac (33700) · headcount 10 to 19 employees · SIREN 332867845

A contract awarded to a consortium of 5 holders; above, the main holder. With it: Osmose Organisation de Services et Maitrise d'Oeuvre du Sport et de l'Environnement, 3 Ingénieurs Associés 3 IA, Sud Ouest Ingénierie Technique (S.O.I.T.). The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 11 by amount of the 22 contracts La Riche published for 2025.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.