La Sentinelle: where the money goes
The public contracts of La Sentinelle
Up to €2.7M: the maximum amount of the public contracts signed in 2025, over their whole term.
8 contracts in 2025 · €14.2M published from 2022 to 2025. Maximum amounts planned.
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid.
Contracts signed by year
Click a year to see its contracts
Purchases by category, 2022–2025
Click a category to see its contracts
The 2 other categories
Main contracts of 2025
Click a contract to see its fiche
- Infrastructures sportivesAvenir Jardins · consortium of 2 holders, whole-contract amountup to €1.1M
- Repas en liaison froide pour la restauration scolaire et les accueils de loisirsApi Restauration · framework agreement: a maximum envelope, not spendingup to €560k
- Gros œuvre étenduMokhaup to €408k
- Création d’une voirie interne et extension des réseaux au droit de la nouvelle écoleSociété de Travaux du Bassin Minierup to €206k
- Ventilation, plomberieHerve Thermiqueup to €121k
- Terrassement, fondations, voirie et réseaux diversEiffage Construction Nord Pas de Calaisup to €110k
- Éclairage sportifEiffage Énergie Systemes - Infra Nordup to €98k
- ÉlectricitéÉlectricité Industrielle du Nordup to €44k
Main suppliers, 2022–2025
Click a company to see its contracts
- Goudalle Charpente2 contractsup to €2.4M
- HDF Construction2 contractsup to €1.5M
- Missenard-Quint B4 contractsup to €1.2M
- Avenir Jardins1 contractup to €1.1M
- Spie Batignolles Nord (Karpinski)4 contractsup to €1M
- SARL Billiet2 contractsup to €800k
- Ramery Enveloppe2 contractsup to €646k
- Locmat3 contractsup to €577k
The 23 other suppliers
- Api Restauration1 contractup to €560k
- Soc Daniel Devred2 contractsup to €554k
- Engie2 contractsup to €420k
- Mokha1 contractup to €408k
- Dupont Restauration1 contractup to €309k
- Electr Industr et TRPT Force (Citeos)2 contractsup to €255k
- Perez Freres1 contractup to €246k
- Riso France SA2 contractsup to €234k
- Tub 2000 & TS2 contractsup to €209k
- Établissements Pique et Fils2 contractsup to €206k
- Société de Travaux du Bassin Minier1 contractup to €206k
- Equip Froid et Collectivites1 contractup to €151k
- Soc Rudant et Fils2 contractsup to €138k
- Herve Thermique1 contractup to €121k
- Électricité Industrielle du Nord2 contractsup to €117k
- Eiffage Construction Nord Pas de Calais1 contractup to €110k
- Volterres1 contractup to €100k
- Eiffage Énergie Systemes - Infra Nord1 contractup to €98k
- EURL RC2B2 contractsup to €90k
- Fosse1 contractup to €89k
- Société Nouvelle Sobatal1 contractup to €86k
- Établissement Devreese1 contractup to €68k
- SARL Farasse Toiture B.E.1 contractup to €66k
Understanding these figures
What does a contract’s amount measure?
A contract’s amount is the maximum allowed over its whole term, often several years: it is not what the town spends in the year. The lots of one contract are grouped.
Where do these figures come from?
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.
Source: Public procurement — DECP (data.gouv.fr) ↗, consolidated and checked by Colin Maudry (colibre.fr ↗)