Skip to main content

Public contracts of Le Havre · 2021 · Construction and buildings

Fabrique de rouelles

Construction d’un EAS

€28k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 2 September 2021 · ended around March 2022 · 6 months

Company selected

Entreprise Balbiano SATravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Epouville (76133) · headcount 50 to 99 employees · SIREN 367500337

Number 52 by amount of the 82 contracts Le Havre published for 2021.

Other contracts of Entreprise Balbiano SA in Le Havre

Salle des fêtes de Bléville2022 · maximum over 4 months85€kRénovation énergétique du gymnase André Saussaye2022 · maximum over 2 months66€kOsmose 2, site Flaubert : aménagement du SEPSH et de la Direction…2021 · maximum over 2 months126€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.