Public contracts of Le Lamentin · 2024
Lot3 construction modulaire a long-pré
Number 116 by amount of the 204 contracts Le Lamentin awarded in 2024.
Original label (DECP) : « Lot3 construction modulaire a long-pré » · Contract · Construction and Bâtiment · Travaux · carried out in 97232
53k €
contract ceiling — what was paid on it is not published
Who won it
Bimini Construction MartiniqueSIREN 499669992The competition
Number of bids not published for that year: the field is only systematic from 2024.
Open call for tenders · awarded to 1 company
Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.
The form of the contract
PriceMixte
Published amendments1
Other contracts of Bimini Construction Martinique in Le Lamentin
Lot02 gros oeuvre2025105k€TRAVAUX DE FOURNITURE ET POSE DE CONSTRUCTIONS MODULAIRES A L’ECOLE ELEMENTAIRE DE GONDEAU A: Lot 2: Constructions modulaires : Fourniture et pose construction modulaire pour salle de classe…2025105k€Lot4 construction modulaire a l école primaire de bélème202452k€Fourniture et pose de constructions modulaires pour des associations et écoles de la ville du Lamentin.: Lot 3 : Construction d’un modulaire à l’école maternelle de LONG-PRE202153k€Fourniture et pose de constructions modulaires pour des associations et écoles de la ville du Lamentin.: Lot 4 : Construction d’un modulaire à l’école primaire de BELEME.202147k€Marchés de plus de 40 000 € HT déclarés à la notification (DECP) : montants des contrats, pas les paiements. Les plus petits marchés ne sont pas publiés ; les montants manifestement erronés sont écartés.