Supplier of Le Monastier-sur-Gazeille · Construction and buildings
Fabien Michel
Fabien Michel holds 2 public contracts awarded by Le Monastier-sur-Gazeille in 2022. That is 43% of the value of the contracts the town awarded in 2022.
head office in Saint-Pierre-Eynac (43) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 534783972
Its contracts in Le Monastier-sur-Gazeille
Maximum amount of each contract, over its whole term: not what was paid.
Aménagement de la place du Vallat : gros œuvre, maçonnerie, pierre…2022 · maximum over 15 months · at most ~€754k a year on average · 2 lots · 4 holders, whole-contract amount · Simplified procedure€943kElsewhere in France
Fabien Michel holds contracts in 12 towns, worth €4.7M at award.