Supplier of Le Monêtier-les-Bains · Construction and buildings
Ocal
Ocal holds 3 public contracts awarded by Le Monêtier-les-Bains between 2024 and 2025. That is 3% of the value of the contracts the town awarded over the period.
head office in Gap (05) · 10 to 19 employees · Travaux de peinture et vitrerie · SIREN 482067527
Its contracts in Le Monêtier-les-Bains
Maximum amount of each contract, over its whole term: not what was paid.
Dépose, fourniture et pose de faux plafond dans la halle bassin des…2025 · maximum over 1 month · Contract awarded without prior advertising or competitive bidding€69kConstruction du spa thermal des grands BainsPlâtrerie faux plafond · 2024 · maximum over 17 months · at most ~€152k a year on average · Contract awarded without prior advertising or competitive bidding€215kTravaux : création du spa des Grands Bains du MonêtierPlâtrerie · Faux plafonds · 2024 · maximum over 17 months · at most ~€149k a year on average · Contract awarded without prior advertising or competitive bidding€211kYear by year
Regions, départements, intercommunalities
Ocal holds contracts awarded by 4 of these bodies, worth €297k.
See the 4 bodies
Communauté de communes du BriançonnaisIntercommunality · 1 contract€97kCommunauté de communes du Guillestrois et du QueyrasIntercommunality · 1 contract€91kCommunauté de communes Serre-PonçonIntercommunality · 1 contract€69kCommunauté d'agglomération Gap-Tallard-DuranceIntercommunality · 1 contract€40kElsewhere in France
Ocal holds contracts in 4 towns, worth €2M at award.