Skip to main content

Public contracts of Le Pont-de-Claix · 2020 · Construction and buildings

Déconstruction et maçonnerie

€529k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 10 December 2020 · ended around April 2022 · 16 months

That is at most ~€397k a year on average: a maximum too.

Company selected

Techniciens Demolit Maconnerie IseroiseTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Le Pont-De-Claix (38800) · headcount 20 to 49 employees · SIREN 442886115

The largest of the 26 contracts Le Pont-de-Claix published for 2020.

Other contracts of Techniciens Demolit Maconnerie Iseroise in Le Pont-de-Claix

Maçonnerie2026 · maximum over 2 years250€Lot n° 1-Démolition2025 · maximum over 3 months54€kDémolition2025 · maximum over 3 months49€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.