Skip to main content

Public contracts of Le Pontet · 2023 · Construction and buildings

Rénovation du bâtiment d’accueil du pôle sécurité : gros œuvre

€500k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 4 August 2023 · ended around November 2024 · 15 months

That is at most ~€400k a year on average: a maximum too.

Company selected

SAS Ribeiro GeorgesTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Le Pontet (84130) · headcount 10 to 19 employees · SIREN 442722096

Number 2 by amount of the 25 contracts Le Pontet published for 2023.

Other contracts of SAS Ribeiro Georges in Le Pontet

Centre de loisirs : démolitions, terrassements, gros œuvre et maçonnerie2022 · maximum over 12 months235€kRénovation des sanitaires pergaud pasteur2022 · maximum over 5 months45€kGros oeuvre2021 · maximum over 1 month56€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.