Public contracts of Le Pré-Saint-Gervais · 2023 · Construction and buildings

Requalification du centre-ville : espaces verts

€554k
maximum contract amount over 21 months — what was paid on it is not published
Signed on 8 June 2023 · ended around March 2025 · 21 months

That is at most ~€317k a year on average: a maximum too.

Company selected

Titulaire sans SIRET

Number 4 by amount of the 43 contracts Le Pré-Saint-Gervais published for 2023. It belongs to the policy Town planning and housing.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

The filing gives no SIRET for the contractor: since we cannot check it is not a person, the name is not published.

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.