Skip to main content

Public contracts of Le Puy-en-Velay · 2022 · Construction and buildings

Démolition maçonnerie

Rénovation passage couvert de la distillerie

€95k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 29 November 2022 · ended around February 2024 · 15 months

That is at most ~€76k a year on average: a maximum too.

Who won it

Fabien MichelTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Pierre-Eynac (43260) · headcount 20 to 49 employees · SIREN 534783972

Number 8 by amount of the 15 contracts Le Puy-en-Velay published for 2022.

Other contracts of Fabien Michel in Le Puy-en-Velay

Restauration de la fontaine de l’Ange édifice CMH2025 · maximum over 10 months71€kMaçonnerie en pierre et finalisation du chantier de l’église…2021 · maximum over 2.5 years1.8€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 3

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.