Supplier of Le Tampon · Construction and buildings
CFM (Construction Fontaine Mellon)
CFM (Construction Fontaine Mellon) holds one public contract awarded by Le Tampon in 2024.
head office in Le Tampon (974) · 3 to 5 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 918749433
€100k
at most, over the whole term of the contracts awarded by Le Tampon in 2024
Its contracts in Le Tampon
Maximum amount of each contract, over its whole term: not what was paid.
Extension et réhabilitation des vestiaires du personnel école primaire…2024 · maximum over 2 months · framework agreement: a maximum envelope, not spending · Simplified procedure€100k