Supplier of Le Temple-de-Bretagne · Construction and buildings
Ouest Loire Constructions (Sahin)
Ouest Loire Constructions (Sahin) holds one public contract awarded by Le Temple-de-Bretagne in 2020. That is 2% of the value of the contracts the town awarded in 2020.
head office in Saint-Herblain (44) · 6 to 9 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 821430188
Its contracts in Le Temple-de-Bretagne
Maximum amount of each contract, over its whole term: not what was paid.
Construction d’une salle polyvalente au Temple de Bretagne…Ravalement · 2020 · maximum over 15 months · at most ~€32k a year on average · Simplified procedure€39k