Supplier of Les Orres · Construction and buildings
Ibf
Ibf holds 2 public contracts awarded by Les Orres between 2021 and 2022. That is 2% of the value of the contracts the town awarded over the period.
head office in Gap (05) · 1 or 2 employees · Travaux de menuiserie bois et PVC · SIREN 503369407
€67k
at most, over the whole term of the contracts awarded by Les Orres in 2022
Its contracts in Les Orres
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation de la Maire des OrresMenuiseries bois · 2022 · maximum over 12 months · Simplified procedure€67kRénovation du bâtiment de l’office de tourisme : menuiseries bois2021 · maximum over 9 months · Simplified procedure€177kYear by year
2022€67 k
2021€177 k