Public contracts of Les Pennes-Mirabeau · 2020 · Construction and buildings

Numéro de la consultation : 2020/TX/0018 Travaux de rénovation du groupe scolaire des Cadeneaux

€106k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 4 June 2020 · ended around August 2020 · 2 months

Company selected

Maitrise et ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Saint-Victoret (13730) · headcount 6 to 9 employees · SIREN 800049074

Number 10 by amount of the 46 contracts Les Pennes-Mirabeau published for 2020. It belongs to the policy Schools.

Other contracts of Maitrise et Construction in Les Pennes-Mirabeau

Travaux de construction de nouveaux vestiaires…2025 · maximum over 4 months154€kNuméro de la consultation : 2020/TX/0068 Travaux, réparation…2021 · maximum over 7 months160€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.