Skip to main content

Public contracts of Les Sables-d'Olonne · 2024 · Construction and buildings

Lot n°6-électricité

€72k
maximum contract amount over 9 months — what was paid on it is not published
Signed on 9 August 2024 · ended around May 2025 · 9 months

Company selected

TurquandTravaux d'installation d'équipements thermiques et de climatisation · registered office Le Poire-Sur-Vie (85170) · headcount 100 to 199 employees · SIREN 348774183

Number 51 by amount of the 91 contracts Les Sables-d'Olonne published for 2024.

Other contracts of Turquand in Les Sables-d'Olonne

Construction du groupe scolaire Cadou : chauffage bois et ventilation2024 · maximum over 21 months1.3€MPlomberie sanitaire2024 · maximum over 21 months365€kLot n° 7-plomberie sanitaires2024 · maximum over 9 months77€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.