Skip to main content

Public contracts of Lesquin · 2021 · Construction and buildings

Construction du groupe scolaire la Motte : structure bois, façade et bardage

€345k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 29 April 2021 · ended around June 2022 · 14 months

That is at most ~€296k a year on average: a maximum too.

Company selected

Lefebvre Detout ConstructionsConstruction d'autres bâtiments · registered office Quelmes (62500) · SIREN 821558855

Number 10 by amount of the 38 contracts Lesquin published for 2021. It belongs to the policy Schools.

Other contracts of Lefebvre Detout Constructions in Lesquin

Périscolaires mermoz /2020 · maximum over 10 months118€kConstruction d’un accueil périscolaire à l’école jean mermoz2020 · maximum over 9 months118€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.