Supplier of Liesse-Notre-Dame · Other
A2 SPS
A2 SPS holds one public contract awarded by Liesse-Notre-Dame in 2026. That is 100% of the value of the contracts the town awarded in 2026.
€71k
at most, over the whole term of the contracts awarded by Liesse-Notre-Dame in 2026
Its contracts in Liesse-Notre-Dame
Maximum amount of each contract, over its whole term: not what was paid.
Halle des sportsMaîtrise d’oeuvre sur travaux · 2026 · maximum over 4 years · at most ~€18k a year on average · Simplified procedure€71k