Skip to main content

Public contracts of Limoges · 2021 · Construction and buildings

Groupe scolaire Condorcet Roussillon

Phase 5-Extension et restructuration du bâtiment à destination du cycle 3

€52k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 18 January 2021 · ended around May 2022 · 16 months

That is at most ~€39k a year on average: a maximum too.

Company selected

Établissements Jouandou et CompagnieTravaux de menuiserie métallique et serrurerie · registered office Panazol (87350) · headcount 20 to 49 employees · SIREN 758501290

Number 170 by amount of the 214 contracts Limoges published for 2021. It belongs to the policy Schools.

Other contracts of Établissements Jouandou et Compagnie in Limoges

Construction d’un équipement de restauration scolaire…2024 · maximum over 2 years127€kConstruction d’un accueil de loisirs pour les mineurs…2023 · maximum over 17 months56€kConstruction d’un accueil de loisirs pour les mineurs…2023 · maximum over 21 months48€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.