Skip to main content

Public contracts of Limoges · 2022 · Construction and buildings

Restructuration de l’école élémentaire blanchot

Façades · Suite des lots 5 et 6

€223k
maximum contract amount over 21 months — what was paid on it is not published
Signed on 17 February 2022 · ended around November 2023 · 21 months

That is at most ~€128k a year on average: a maximum too.

Company selected

Etanche 2000 SASTravaux d'isolation · registered office Rilhac Rancon (87570) · headcount 10 to 19 employees · SIREN 395054869

Number 54 by amount of the 155 contracts Limoges published for 2022. It belongs to the policy Schools.

Other contracts of Etanche 2000 SAS in Limoges

Restructuration du groupe scolaire jean montalat a Limoges2024 · maximum over 2.5 years205€kGroupe scolaire condorcet roussillon2021 · maximum over 16 months167€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.