Skip to main content

Public contracts of Limoges · 2024 · Construction and buildings

Restructuration du groupe scolaire jean montalat a Limoges

Panneaux photovoltaïques

€60k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 22 July 2024 · running until about November 2026 · 2.5 yrs
Ongoing21 Nov 2026

That is at most ~€26k a year on average: a maximum too.

Company selected

Charantelec (Cegelec Limousin)Travaux d'installation électrique dans tous locaux · registered office Fleac (16730) · headcount 100 to 199 employees · SIREN 414780494

Number 199 by amount of the 237 contracts Limoges published for 2024. It belongs to the policy Schools.

Other contracts of Charantelec (Cegelec Limousin) in Limoges

Restructuration du groupe scolaire Jean Montalat à Limoges2024 · maximum over 4 years289€kRestructuration du groupe scolaire jean montalat a Limoges2024 · maximum over 2.5 years230€kModernisation de l’installation électrique du TGBT de la bibliothèque…2024 · maximum over 14 months121€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.