Skip to main content

Public contracts of Livry-Gargan · 2023 · Construction and buildings

Construction du groupe scolaire du quartier Poudrerie : terrassement et gros œuvre

€4.6M
maximum contract amount over 4 years — what was paid on it is not published
Signed on 27 November 2023 · running until about November 2027 · 4 yrs
Ongoing27 Nov 2027

That is at most ~€1.2M a year on average: a maximum too.

Company selected

Établissements HannyTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Vaux-Le-Penil (77000) · headcount 100 to 199 employees · SIREN 786350157

Number 2 by amount of the 63 contracts Livry-Gargan published for 2023. It belongs to the policy Schools.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 7

Subcontracting declared : yes

The 2 lots : 2.3 €M · 2.3 €M

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.