Supplier of Longeville-sur-Mogne · Construction and buildings
CMF Constructor
CMF Constructor holds one public contract awarded by Longeville-sur-Mogne in 2022. That is 100% of the value of the contracts the town awarded in 2022.
head office in Saint-Lye (10) · 6 to 9 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 810104059
Its contracts in Longeville-sur-Mogne
Maximum amount of each contract, over its whole term: not what was paid.
Démolition et gros œuvre2022 · maximum over 6 months · Simplified procedure€78kElsewhere in France
CMF Constructor holds contracts in 9 towns, worth €1.1M at award.