Skip to main content

Public contracts of Longjumeau · 2023 · Construction and buildings

Travaux de rénovation énergétique de l’école élémentaire de Balizy

Travaux menuiseries extérieures

€81k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 1 June 2023 · ended around October 2023 · 4 months

Company selected

FMDTravaux de menuiserie métallique et serrurerie · registered office Vitry-Sur-Seine (94400) · headcount 20 to 49 employees · SIREN 301188074

Number 17 by amount of the 32 contracts Longjumeau published for 2023. It belongs to the policy Schools.

Other contracts of FMD in Longjumeau

Rénovation énergétique du gymnase Rigoulot : menuiseries extérieures…2025 · maximum over 8 months185€kTravaux de rénovation salle Anne Frank2025 · maximum over 3 months36€kTravaux de remplacement de châssis et création de garde-corps2020 · maximum over 3 months10€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.