Skip to main content

Public contracts of Longjumeau · 2023 · Construction and buildings

Travaux de rénovation énergétique de l’école élémentaire de Balizy

Travaux doublage murs et mise en peinture

€127k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 1 June 2023 · ended around October 2023 · 4 months

Company selected

AR RenovationConstruction d'autres bâtiments · registered office Marcoussis (91460) · headcount 3 to 5 employees · SIREN 503115057

Number 7 by amount of the 32 contracts Longjumeau published for 2023. It belongs to the policy Schools.

Other contracts of AR Renovation in Longjumeau

Travaux d’amélioration des locaux de travail des agents2026 · maximum over 4 months45€kTravaux de rénovation espaces de restauration Perrault2026 · maximum over 2 months32€kTravaux d’amélioration des locaux de travail des agents2026 · maximum over 2 months20€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.