Skip to main content

Public contracts of Loon-Plage · 2024 · Construction and buildings

Plâtrerie Faux-plafonds

EXTENSION DU TENNIS CLUB DE Loon-Plage

€83k
maximum contract amount over 14 months — what was paid on it is not published
Signed on 21 June 2024 · ended around August 2025 · 14 months

That is at most ~€71k a year on average: a maximum too.

Company selected

R2C Renovation des 2 CapsConstruction de maisons individuelles · registered office Marquise (62250) · headcount 3 to 5 employees · SIREN 832614044

Number 54 by amount of the 96 contracts Loon-Plage published for 2024.

Other contracts of R2C Renovation des 2 Caps in Loon-Plage

Plâtrerie et faux plafonds2024 · maximum over 15 months97€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.