Skip to main content

Public contracts of Mâcon · 2019 · Construction and buildings

ZAC Monnier, bassin de stockage et de restitution : génie civil

€1.8M
maximum contract amount over 10 months — what was paid on it is not published
Signed on 27 December 2019 · ended around October 2020 · 10 months

Company selected

Soletanche Bachy Fondations SpecialesAutres travaux spécialisés de construction · registered office Rungis (94150) · headcount 200 to 249 employees · SIREN 351911102

A contract awarded to 4 holders; above, the main holder. With it: Gcbat, Entreprise Hubert Rougeot Meursault (Rougeot Travaux), Soletanche Bachy France. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 51 contracts Mâcon published for 2019.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.