Supplier of Macouria · Construction and buildings
Cefege (Conception Etude du Flux et Électricité Générale)
Cefege (Conception Etude du Flux et Électricité Générale) holds one public contract awarded by Macouria in 2026. That is 2% of the value of the contracts the town awarded in 2026.
head office in Matoury (973) · 20 to 49 employees · Travaux d'installation électrique dans tous locaux · SIREN 803319698
Its contracts in Macouria
Maximum amount of each contract, over its whole term: not what was paid.
Électricité courants forts et faibles2026 · maximum over 6 months · Simplified procedure€45kRegions, départements, intercommunalities
Cefege (Conception Etude du Flux et Électricité Générale) holds contracts awarded by 3 of these bodies, worth €1.4M.
Elsewhere in France
Cefege (Conception Etude du Flux et Électricité Générale) holds contracts in 7 towns, worth €2.6M at award.