Skip to main content

Public contracts of Malataverne · 2022 · Construction and buildings

Construction d’un centre de loisirs et d’un restaurant scolaire

€1.8M
maximum contract amount over 20 months — what was paid on it is not published
Signed on 24 May 2022 · ended around January 2024 · 20 months

That is at most ~€1.1M a year on average: a maximum too.

Company selected

Électricité Générale Reboul-CotteTravaux d'installation électrique dans tous locaux · registered office Plougastel-Daoulas (29470) · SIREN 300461142

A contract awarded to 15 holders; above, the main holder. With it: Piovesan, Delorme Battandier, Satras Société d'Application de Travaux Speciaux, Audigier TP, Angelino et Fils, Ermhes, Menuiserie Vareille (Vareille Gilbert), SARL P.P.S., AD Sols (A.D. Sols), Metalliance Industrie, Satibat-Chape, MK Etancheite, Jboquet Peinture, LB-BTP. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 4 contracts Malataverne published for 2022.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.