Skip to main content

Public contracts of Mallemort · 2023 · Construction and buildings

Réfection des couvertures et de l’installation électrique de l’église Saint-Michel : couvertures

€272k
maximum contract amount over 7 months — what was paid on it is not published
Signed on 21 January 2023 · ended around August 2023 · 7 months

Company selected

Bellec RenovationTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Pertuis (84120) · headcount 6 to 9 employees · SIREN 791926264

Number 3 by amount of the 8 contracts Mallemort published for 2023. It belongs to the policy Culture, sport and youth.

Other contracts of Bellec Renovation in Mallemort

2022 08 Réfection de la toiture de la chapelle des pénitents blancs2022 · maximum over 5 months75€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.