Skip to main content

Public contracts of Malling · 2019 · Construction and buildings

Travaux pour la réhabilitation et la transformation du presbytère en mairie et amélioration de la salle communale de Malling

Chauffage ventilation sanitaire

€85k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 26 September 2019 · ended around December 2020 · 15 months

That is at most ~€68k a year on average: a maximum too.

Company selected

Technic ChauffageTravaux d'installation d'équipements thermiques et de climatisation · registered office Metz (57070) · headcount 1 or 2 employees · SIREN 497943605

Number 5 by amount of the 23 contracts Malling published for 2019.

Other contracts of Technic Chauffage in Malling

Réhabilitation du presbytère2019 · maximum over 15 months61€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.