Skip to main content

Public contracts of Mana · 2024 · Construction and buildings

Construction du groupe scolaire de Charvein

La commune fait construire le groupe scolaire de Charvein. Ce marché de travaux en est un lot, le lot 12-1.

€964k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 25 October 2024 · running until about February 2027 · 2.5 yrs
Ongoing24 Feb 2027

That is at most ~€413k a year on average: a maximum too.

Company selected

Eiffage Infra Guyane (Dle Outre Mer)Construction de réseaux pour fluides · registered office Cayenne (97300) · headcount 100 to 199 employees · SIREN 488187212

A contract awarded to 2 holders; above, the main holder. With it: Eiffage Route Guyane. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 37 contracts Mana published for 2024. It belongs to the policy Schools.

Other contracts of Eiffage Infra Guyane (Dle Outre Mer) in Mana

Aménagement de la rue de l’Église au bourg de Javouhey2025 · maximum over 9 months372€kTravaux pour la construction du groupe scolaire de Charvein-22024 · maximum over 2.5 years164€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 5

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.