Skip to main content

Public contracts of Marignier · 2019 · Construction and buildings

Réhabilitation de l’école du centre et de ses annexes

€248k
maximum contract amount over 3 years — what was paid on it is not published
Signed on 23 May 2019 · ended around May 2022 · 3 yrs

That is at most ~€83k a year on average: a maximum too.

Company selected

Ferblanterie Thononaise SASTravaux de couverture par éléments · registered office Orcier (74550) · SIREN 330532896

A contract awarded to 2 holders; above, the main holder. With it: Entreprise Baratay Gaston. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 7 by amount of the 20 contracts Marignier published for 2019. It belongs to the policy Schools.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.