Skip to main content

Public contracts of Mas-Blanc-des-Alpilles · 2022 · Construction and buildings

Rénovation et extention de l’hotel de ville

€51k
maximum contract amount over 21 months — what was paid on it is not published
Signed on 31 January 2022 · ended around November 2023 · 21 months

That is at most ~€29k a year on average: a maximum too.

Who won it

Briseno FreresTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Boulbon (13150) · headcount 20 to 49 employees · SIREN 449434968

Number 9 by amount of the 9 contracts Mas-Blanc-des-Alpilles published for 2022.

Other contracts of Briseno Freres in Mas-Blanc-des-Alpilles

Création d’un pôle médical2025 · maximum over 8 months50€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.