Public contracts of Mauguio · 2024 · Construction and buildings

Extension et maintenance du territoire connecté et du port de plaisance

€5.2M
framework agreement: a maximum envelope for orders over 4 years, not spending — what was paid on it is not published
Signed on 14 August 2024 · running until about August 2028 · 4 yrs
Ongoing14 Aug 2028

That is at most ~€1.3M a year on average: a maximum too.

Company selected

SA BondonConstruction de réseaux électriques et de télécommunications · registered office Lattes (34970) · headcount 20 to 49 employees · SIREN 327730495

A contract awarded to a consortium of 2 holders; above, the main holder. With it: Eiffage Énergie Systemes - Iperion. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

3 bids received

Median for this procedure in 2024: 3 bids, across 48728 comparable contracts. Simplified procedure · awarded to 2 companies

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

The largest of the 62 contracts Mauguio published for 2024.

Other contracts of SA Bondon in Mauguio

Prestations similaires pour la reconfiguration des pontons dune…2026 · maximum over 5 months293€kÉquipements portuaires de plaisance : pontons, rampes, modules…2025 · maximum over 7 months1.1€MÉclairage public et réseaux électriques2024 · maximum over 4 years1.4€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Framework agreement : yes: orders follow, the amount is a ceiling

Price : Unitaire

Published amendments : 9

Subcontracting declared : yes

Environmental considerations : Critère environnemental

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.