Public contracts of Mayenne · 2023 · Construction and buildings
Restructuration et extension du groupe scolaire Pierre et Marie Curie à Mayenne
Peinture · Nettoyage
That is at most ~€63k a year on average: a maximum too.
Company selected
SAS DurandTravaux de peinture et vitrerie · registered office Mayenne (53100) · headcount 100 to 199 employees · SIREN 334981669Number 29 by amount of the 42 contracts Mayenne published for 2023.
Other contracts of SAS Durand in Mayenne
Peinture2025 · maximum over 18 months75€kTravaux de rénovation de l’école maternelle de l’Angellerie à Mayenne2025 · maximum over 18 months70€kPeinture Travaux tribune du stade2023 · maximum over 1 month99€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.