Supplier of Mérignac · Construction and buildings
Lithosphere
Lithosphere holds one public contract awarded by Mérignac in 2026. That is 1% of the value of the contracts the town awarded in 2026.
€63k
at most, over the whole term of the contracts awarded by Mérignac in 2026
What Lithosphere does in Mérignac
Maximum amount of each contract, over its whole term: not what was paid.
Travaux de construction d’un colombarium2026 · maximum over 7 months · Contract awarded without prior advertising or competitive bidding€63k