Public contracts of Metz · 2021 · Construction and buildings

Gros oeuvre groupe scolaire st-maximin

€37k
maximum contract amount over 9 months — what was paid on it is not published
Signed on 11 June 2021 · ended around March 2022 · 9 months

Company selected

W.Z. ConstructionsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Semecourt (57280) · headcount 50 to 99 employees · SIREN 334474400

Number 268 by amount of the 334 contracts Metz published for 2021.

Other contracts of W.Z. Constructions in Metz

Travaux gros oeuvre-centre de surveillance urbain2022 · maximum over 17 months132€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.