Skip to main content

Public contracts of Meudon · 2021 · Construction and buildings

Gros oeuvre démolition carrelage rénovation gs perrault brossolette sis avenue henri iv a Meudon

€50k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 2 June 2021 · ended around October 2021 · 4 months

Who won it

Société de Renovation GénéraleTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Hardricourt (78250) · headcount 20 to 49 employees · SIREN 800506958

Number 72 by amount of the 89 contracts Meudon published for 2021. It belongs to the policy Streets and transport.

Other contracts of Société de Renovation Générale in Meudon

Rénovation du groupe scolaire Perrault Brossolette sis avenue Henri IV…2021 · maximum over 12 months46€kRénovation du groupe scolaire Perrault Brossolette sis avenue Henri IV…2021 · maximum over 12 months26€kLot n°1 gros oeuvre2020 · maximum over 3 months41€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.