Public contracts of Meudon · 2021 · Professional services

Subséquent n°17 du

Réf 3s002 19f015-mission de maîtrise d’oeuvre travaux de renovarion du groupe scolaire perrault brossolette

€55k
maximum contract amount over 22 months — what was paid on it is not published
Signed on 29 November 2021 · ended around September 2023 · 22 months

That is at most ~€30k a year on average: a maximum too.

Who won it

Ano ArchitectesActivités d'architecture · registered office Versailles (78000) · headcount 1 or 2 employees · SIREN 377532734

A contract awarded to 3 holders; above, the main holder. With it: Cabinet Bleuse, Bureau d'Études Techniques de Realisations Aerauliques et Thermiques Setrat. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 55 by amount of the 77 contracts Meudon published for 2021.

Other contracts of Ano Architectes in Meudon

Maîtrise d’oeuvre relative au projet de rénovation énergétique de…2024 · maximum over 12 months204€k4s001 mission de maîtrise d’oeuvre pour l’aménagement du sous sol du…2022 · maximum over 9 months216€kAc 19f015-marché subséquent n°1s003 : mission de maîtrise d’oeuvre…2020 · maximum over 19 months83€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.