Supplier of Montauban · Construction and buildings
Sotherm
Sotherm holds one public contract awarded by Montauban in 2019. That is 1% of the value of the contracts the town awarded in 2019.
head office in Montauban (82) · 3 to 5 employees · Travaux d'installation d'équipements thermiques et de climatisation · SIREN 305813958
€150k
at most, over the whole term of the contracts awarded by Montauban in 2019
Its contracts in Montauban
Maximum amount of each contract, over its whole term: not what was paid.
Travaux dans les locaux associatifs ou mis a disposition2019 · maximum over 12 months · Simplified procedure€150k