Skip to main content

Public contracts of Montauban · 2019 · Construction and buildings

Numéro de la consultation : 18/103-École primaire du carreyrat : Mise aux normes accessibilité

€4k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 22 March 2019 · ended around July 2019 · 4 months

Company selected

SARL VedeilheTravaux de peinture et vitrerie · registered office Montauban (82000) · headcount 6 to 9 employees · SIREN 300773140

Number 107 by amount of the 109 contracts Montauban published for 2019.

Other contracts of SARL Vedeilhe in Montauban

Extension du groupe scolaire Jean Moulin2020 · maximum over 13 months18€kTravaux dans les locaux associatifs ou mis à disposition2019 · maximum over 12 months200€kNuméro de la consultation : 19/004-Extension de l’école maternelle de…2019 · maximum over 15 months11€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.