Skip to main content

Public contracts of Montbert · 2020 · Construction and buildings

Construction d’un bâtiment modulaire pour l’espace jeunes

€285k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 23 November 2020 · ended around November 2021 · 12 months

Company selected

SocovalTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Vallet (44330) · headcount 10 to 19 employees · SIREN 350490686

A contract awarded to 2 holders; above, the main holder. With it: Madera. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 3 contracts Montbert published for 2020.

Other contracts of Socoval in Montbert

Gros œuvre2021 · maximum over 14 months149€kConstruction d’un bâtiment modulaire pour l’espace jeunes2020 · maximum over 7 months285€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.